Building the New House p1

As we have accommodation and at the same time a water problem in the present house, we decided to build a new house for the orphans.  
 
We procured land 43 dismil (17730,8 sqf or 1647m2) in the year 2021. We started to build the house October 2022. The foundation of the house is for a 4-storied building but for now we shall build it with two floors. 
 
The ground floor:  
2 office rooms, 1 sewing room, 1 store room, 1 kitchen, 1 dining room, 1 hall room, 1 computer room, 1 library, 1 reception, 3 toilets & 1 bathroom,  
 
1st floor: 13 bed rooms with four beds in each room with 13 bathrooms.   
 
Each floor is nearly 7000 sqf (650m2) large and accommodation in the new building for 52 orphan girls. 
 
It is planned that the children will be able to move in on February 1st, 2024.

1.

2023-10-25-at-06.39

2.

2023-10-25-at-06.40